# capacity2026 > A free, sixteen-chapter primer on grid capacity for the AI buildout: what capacity physically is, how U.S. capacity markets work, how data centers procure power, and how transactive capacity can connect new load years faster. By Ben Hilborn, Elastic Energy. capacity2026 is an independent, honorary sequel to Neel Somani's Power 2026 (https://power2026.ai). Power 2026 covers how electricity is priced (the megawatt-hour); capacity2026 covers grid capacity (the megawatt): what a specific bus can import or export in a specific hour, how U.S. markets administer that limit, how data centers buy it, and how "transactive capacity" can connect new load faster. Author: Ben Hilborn, co-founder of Elastic Energy (https://elasticenergy.com). Published 2026-11-23. Free to read. ## Citing this primer - Please cite as: Ben Hilborn, "capacity2026: The complete primer on data-center capacity procurement," Elastic Energy, 2026, https://capacity2026.ai/ - Link to the specific chapter anchor below when you draw on one chapter. - Figures dated after mid-2026 come from the sources listed at https://capacity2026.ai/#sources; check them there before restating them as current. ## Full text - [Full primer as Markdown](https://capacity2026.ai/capacity2026.md): the complete text with all 33 numbered sources. - [Web version](https://capacity2026.ai/): the same text with figures, a U.S. capacity-regime map and the Oakridge case study. ## Chapters - [Chapter 01: The node question](https://capacity2026.ai/#ch-1) - [Chapter 02: Nameplate vs. deliverable vs. available](https://capacity2026.ai/#ch-2) - [Chapter 03: Hosting capacity is a time series](https://capacity2026.ai/#ch-3) - [Chapter 04: From physics to product](https://capacity2026.ai/#ch-4) - [Chapter 05: The map](https://capacity2026.ai/#ch-5) - [Chapter 06: Anatomy of a capacity auction](https://capacity2026.ai/#ch-6) - [Chapter 07: Accreditation, or what counts](https://capacity2026.ai/#ch-7) - [Chapter 08: The bilateral world](https://capacity2026.ai/#ch-8) - [Chapter 09: The load request](https://capacity2026.ai/#ch-9) - [Chapter 10: Finding capacity](https://capacity2026.ai/#ch-10) - [Chapter 11: The commercial menu](https://capacity2026.ai/#ch-11) - [Chapter 12: Flexible load as capacity](https://capacity2026.ai/#ch-12) - [Chapter 13: From static product to dynamic capacity](https://capacity2026.ai/#ch-13) - [Chapter 14: The edge as supplier](https://capacity2026.ai/#ch-14) - [Chapter 15: The four hard problems](https://capacity2026.ai/#ch-15) - [Case study: Unlocking 60 MW at Oakridge Substation](https://capacity2026.ai/#case-study) - [Chapter 16: The thesis](https://capacity2026.ai/#ch-16) ## Quick answers - **What is grid capacity, and how is it different from energy?** Energy is measured in megawatt-hours: how much electricity is consumed over time. Capacity is measured in megawatts: how much power the network can guarantee to deliver to a specific bus during the hours when the local grid is stressed. That limit is set hour by hour by thermal ratings, voltage, stability, protection and N−1 contingency margins, so it is a nodal, hourly quantity rather than a single annual number. - **Why is grid capacity the bottleneck for AI data centers?** Large loads now ask for 100 MW or more on eighteen-month schedules, while large power transformers take 30 to 48 months to manufacture and roughly 2,600 GW of generation and storage sat in U.S. interconnection queues at the end of 2023. Static planning rules size every connection against the single worst hour of the year, so substations that have headroom for most of the year still report no capacity available. - **How do U.S. capacity markets work?** The United States runs five resource adequacy regimes: multi-year forward auctions (PJM), prompt and seasonal auctions (NYISO, MISO and, from 2028, ISO-NE), energy-only scarcity pricing (ERCOT), mandatory bilateral resource adequacy (CAISO and much of the West), and vertically integrated utility planning (the Southeast and much of SPP). PJM’s last three Base Residual Auctions cleared at their price caps of $329.17, $333.44 and $325.00 per MW-day. - **What is transactive capacity?** Transactive capacity is firm, locational, time-specific net deliverability, priced against real physical constraints and settled on measured performance. Instead of an annual zonal credit, a constrained substation buys relief for the specific hours it needs it, from batteries, flexible data center load or aggregated home and commercial devices on the same bus. - **Can flexible data center load speed up grid interconnection?** Yes. Bulk grid constraints typically bind in only 20 to 50 hours a year, under 0.5% of the 8,760 hours. A campus that can cap its net draw in those hours, through workload orchestration and on-site batteries, can connect under conditional interconnection frameworks years ahead of transmission upgrades. Under PJM’s 24/7 demand response rules, 30 MW of dispatchable flexibility also earns about $3.24 million a year in capacity payments. - **How did the Oakridge case study unlock 60 MW?** At the illustrative Oakridge 230/69 kV substation, adding a 60 MW AI campus overloads the 165 MW N−1 limit in only 34 hours a year, a 620 MWh wedge. A 38 MW portfolio of residential and commercial batteries, smart HVAC and EV chargers, and campus batteries and workload flexibility holds net flow at or below 165 MW. The campus energizes in month 8 instead of waiting 42 months for a new transformer, at a net bridge cost of about $1.89 million a year, or $4.23 per MWh. - **How does capacity2026 relate to Power 2026?** capacity2026 is an independent, honorary sequel to Neel Somani’s Power 2026 (power2026.ai). Power 2026 explains how electricity gets its price, the megawatt-hour. capacity2026 covers the other number on the bill, the megawatt: how much power the grid can deliver to a specific node in the hours that matter.